40 Portman Square.
Description



Main Contractor: HBG Construction.


Project Value : £1.2 Million.


No Of Operators on site : 25no


Duration of Contract: 12 Months


40 Portman Square
London
W1H 6LT


40 Portman Square, London. The contract is based on the installation of LTHW, Chilled, Condensate and Gas pipework to 7 floors of offices and 2 floors of residential appartments. The pipe work feeds 355 fan coil units on a 4no pipe system into the boiler room, roof top, chiller areas and associated pump rooms.


Areas of Installation:
Basement to 6th Floors - Office Area
7th and 8th Floors - Apartments
Basement - Plantrooms
Roof Level - Dry Coolers.


Services Supplied:
LTHW
Chilled Water
Condensate Water Services


Pipe Sizes:
1/2" to 12" pipework pre-fabricated within workshop at Luton, including all screwed sub-mains pipework to the
fan coil units which reduces the labour force on site.